Products

Electric Well-Testing Winch

The speed control switch must be at the zero position ② the direction switch is set to the "STOP" position.

Product Details

Electric Well-Testing Winch

Electric Well-Testing Winch

Electric Well-Testing Winch

Electric winch control panel operation. Before pressing the start button; ① The speed control switch must be at the zero position ② the direction switch is set to the "STOP" position. The power indicator light is on, the inverter indicates it is in running state, and the digital window (A.HZ.V) displays the unit corresponding to the current parameter. 2. Hoisting and lowering (direction switch): during operation, the inverter FWD light is on, indicating hoisting; the REV light is on, indicating lowering. 3. The inverter ALM light is on, indicating a fault state; when the light is off, it is normal.

4. When braking, the speed control switch must be set to the zero position.

5. When stopping, set the direction switch to the stop position, set the speed control switch to the zero position, and press the stop button; the power indicator light goes off.

6. Power supply 3-AC380V.

Note:

The inverter parameters have been preset before leaving the factory and must not be opened or modified by non-professionals. Fill the drum with No. N46 machine oil, oil filling amount 17 kg. Check during use; generally the oil level is normal at 2/3 of the drum motor, 2/3 and if oil is insufficient, add it promptly. (Filled at the factory)

DG Series Electric Well-Testing Winches, Electric

Back to List

Send Us a Message

Fields marked * are required.